Cal Poly University
Consultant: George Thomas Howard & Associates Contractor: Centex Golden Construction
  • Design, Fabrication, Installation and fabrication
  • 27 Counterweight line sets
  • 5 Pairs of side light ladder rigging sets
  • Motorized speaker cluster rigging with controls
  • Rehearsal hall pipe grid system
  • Motorized steel framed fire curtain
  • 2 Orchestra lifts
  • 240 sq. ft. spiral stage lift with controls
Cal Poly Performing Arts Center is a state-of-the-art facility with incomparable acoustics and rigging which promises a quality performance 100 percent of the time. A landmark of Protech's commitment to excellence, the majestic 1,289-seat Sidney Harman Hall has hosted professional performers including, American Idol finalist Melinda Doolittle and the Philharmonic of Poland.

USA / CA